neeraj kumar thakur 2013. Powered by Blogger.

Tuesday, 23 July 2013

Quantity Surveying and Estimation Lecture 2 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
2. Estimated cost of a proposed building from materials and labour by CBRI method
3. Calculation of wall area in a building by measuring floor area for ordinary building and framed
structure.
4. Calculation of approximate cost of water supply, sanitation, electrical works for a building. 
+

USE OF MS OFFICE EXCEL


Date -
7th A1 - 22 july 2013
Absent - 05, 09, 15,26
7th A2 - 23 July 2013
Absent- 35, 44, 57
 
7th B1 - 25 July 2013
Absent-1,3,5,11,12,13,14,15,16,17,19,22,24,26
7th B2 - 26 July 2013
Absent-31,33,36,39,41,43,45,48,53


Lecture 2 link (Drive)
CBRI Excel Sheet (mediafire)
Class 2 PPT (mediafire) 

SOLVE Question Given in the lecture 2 slide.
SUBMIT LECTURE 1 and LECTURE 2 ALL QUESTIONS  Solved in Practical Copy or A4 sheet (Attached in file) by  
7th A1 - 30th July 2013
7th A2 - 31st July 2013
7th B1 - 2 Aug 2013
7th B2 - 3 Aug 2013  
TRY Solving question of CBRI Method using Excel or else can do calculation manually.
Please Note that reports submitted after the desired date shall not be considered for checking / Remarks .