Quantity Surveying and Estimation Lecture 1 Slides
Topics Covered
Experiment no-
1. Estimating cost of a proposed building on Plinth area method, Volume area method.
Date -
7th A1 - 15 july 2013
Absent - 03, 05, 09,13,15,26
7th A2 -16 july 2013
Absent- 35, 48,50,52,56
7th B1 -18 july 2013
Absent- 03,05,12,13,16,19,29
7th B2 -19 july 2013
Absent-44
Lecture 1 link
Topics Covered
Experiment no-
1. Estimating cost of a proposed building on Plinth area method, Volume area method.
Date -
7th A1 - 15 july 2013
Absent - 03, 05, 09,13,15,26
7th A2 -16 july 2013
Absent- 35, 48,50,52,56
7th B1 -18 july 2013
Absent- 03,05,12,13,16,19,29
7th B2 -19 july 2013
Absent-44
Lecture 1 link
0 comments:
Post a Comment