Quantity Surveying and Estimation Lecture 3 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
7. Analysis of rates: Concrete work, Brick work, Plaster, Flooring
+
USE OF MS OFFICE EXCEL

7th A1 29th July 2013   
W -2,8,16,18,25,26,27,28,30,32.33.34.36.37.38.39.41.42.45.47.51.52.53.54.56.58.59.61
L -6,7,10,11,12,13,17,20,21,22,23,24,29,31.40.46.49.50.
Rest were absent .
No of Copies Submitted - 27/61

Correction : 
Water charge will be 1 % of  ( total material and labour cost ) and not of  (material + labour + contingents )
Profit will be 10 % of  ( total material and labour cost ) and not of  (material + labour + contingents ) as taught in class.

7th B1/B2-
W -2,4,6,7,10,12.13.16.18.19.20.23.25.26.30.32.36.37.38.39.41.42.43.46.47.48.49.50.51.54
L  -1.8.9.11.14.15.17.21.24.27.28.29.31.33.34.35.44.45
Rest were absent .
No of Copies Submitted - 14/54

Link 1 - Microsoft Drive
Link 2 Class 3 slides and excel sheets (Google Drive)