Tuesday, 31 December 2013

Surveying II (2) Lab Manual CSVTU 4th sem

Find link below for the download link

List of Practical
1)  Determination of constant of Tacheometer.
2)  Determination of elevation of point by Tacheometricsurveying.
3)  Determination of elevation of point and horizontal  distance between
them by Tacheometric survey.
4)  Determination  of  gradient  of  given  length  if  road  by  Tacheometric
survey.
5)  Setting  out  of  simple  circular  curve  by  offset  from chord  produced
method.
6)  Setting out of simple circular curve by Rankine method of tangential
angle.
7)  Setting out of simple transition curve by tangential angle method.
8)  Study of stereoscope.


click here for download link

CSVTU Surveying-I Lab Manual 3rd sem civil Engineering

Find link below for download

List of Practical 

1)  Measurement of distance by ranging and chaining.
2)  Locating various objects by chain & cross staff surveying.
3)  Determination of area of polygon by chain and crossstaff 
survey.
4)  Measurement of bearings of sides of traverse with prismatic 
compass and computation of correct included angle.
5)  Locating given building by chain and compass traversing, 
(One full size drawing sheet)
6)  Determination of elevation of various points with dumpy level 
by collimation plane method and rise & fall method.
7)  Fixing bench mark with respect to temporary bench mark 
with dumpy level by fly leveling and check levelling.
8)   L-Section and cross section of road. 
( One full size drawing sheet for L-Section and cross section )
9)  Measurement of horizontal angles theodolite by method of 
repetition.
10)  Measurement of vertical angles with theodolite. 
( One full size drawing sheet) 
11)  Determination of horizontal distance between two 
inaccessible points with thedolite.
12)  Locating given building by thedolite traversing. 
(One full size drawing sheet)
13)  Locating given building by plain table traversing. 
(One full size drawing sheet)
14)  Three point problem in plane table traversing. 
15)  Determination of elevation of point by trigonometric 
levelling.
16)  Contour plan of given area. 
(One full size drawing sheet)
17)  Study of planimeter.
18)  Determination of area of irregular figure by using planimeter 
19)  Study of Box Sextant, Abney Level, Optical Theodolite. 
20)  To give layout of given plan of building.


click here to download

Friday, 27 December 2013

Lecture notes on Prestressed concrete

Lecture notes on Prestressed concrete :

find link at the end of this post

Syllabus
UNIT I INTRODUCTION – THEORY AND BEHAVIOUR 9
Basic concepts – Advantages – Materials required – Systems and methods of prestressing –
Analysis of sections – Stress concept – Strength concept – Load balancing concept – Effect of
loading on the tensile stresses in tendons – Effect of tendon profile on deflections – Factors
influencing deflections – Calculation of deflections – Short term and long term deflections -
Losses of prestress – Estimation of crack width

UNIT II DESIGN CONCEPTS 9
Flexural strength – Simplified procedures as per codes – strain compatibility method – Basic
concepts in selection of cross section for bending – stress distribution in end block, Design of
anchorage zone reinforcement – Limit state design criteria – Partial prestressing – Applications.

UNIT III CIRCULAR PRESTRESSING 9
Design of prestressed concrete tanks – Pipes

UNIT IV COMPOSITE CONSTRUCTION 9
Analysis for stresses – Estimate for deflections – Flexural and shear strength of composite
members

UNIT V PRE-STRESSED CONCRETE BRIDGES 9
General aspects – pretensioned prestressed bridge decks – Post tensioned prestressed bridge
decks – Principles of design only.

TOTAL: 45 PERIODS
TEXT BOOKS
1. Krishna Raju N., Prestressed concrete, Tata McGraw Hill Company, New Delhi 1998
2. Mallic S.K. and Gupta A.P., Prestressed concrete, Oxford and IBH publishing Co. Pvt. Ltd.
1997.
3. Rajagopalan, N, “Prestressed Concrete”, Alpha Science, 2002
REFERENCES
1. Ramaswamy G.S., Modern prestressed concrete design, Arnold Heinimen, New Delhi, 1990
2. Lin T.Y. Design of prestressed concrete structures, Asia Publishing House, Bombay 1995.
3. David A.Sheppard, William R. and Philips, Plant Cast precast and prestressed concrete – A
design guide, McGraw Hill, New Delhi 1992.


click link to download


LECTURE NOTES ON AIR AND NOISE POLLUTION

LECTURE NOTES ON AIR AND NOISE POLLUTION

1. Describe the structure of the atmosphere.
2. List the sources of the different types pollutants in the air.
3. Differentiate between primary and secondary pollutants.
4. Describe the action of greenhouse gasses in the green house effect.


CLICK LINK TO DOWNLOAD


Tags : Environmental engineering, AIR AND NOISE POLLUTION, civil engineering

Saturday, 14 September 2013

Tuesday, 3 September 2013

Notes Unit 2 Part 4 Building Plans


Notes  on Unit 2 Part 4
Building Plans: Reading and comprehending a building plan and section.
Convention of assuming the  cutting  plane  at  window  sill  level.
Conventional  symbols  for  representing  doors  etc.  and electrical  and sanitary fittings.
Identification of footing, plinth,  lintel, slab, chajja  etc. on a given cross-section.

Follow and download file
Notes Unit 2 Part 4 Building plans, Symbols


3 Sep 2013 Class 20 Building plans and symbols

Topics Covered
Building Plans: Reading and comprehending a building plan and section.
Convention of assuming the  cutting  plane  at  window  sill  level.
Conventional  symbols  for  representing  doors  etc.  and electrical  and sanitary fittings.
Identification of footing, plinth,  lintel, slab, chajja  etc. on a given cross-section.

Follow the link and download
3 Sep 2013 Class 20 Building plans and symbols


Monday, 2 September 2013

Class 14 to 19th lecture slides BCE

Topics covered
Mortar: Proportions of cement mortar for various uses.
Concreate: Ingredients of concrete. Meaning of M-10, M-15 and M-20 grades, and nominal mix
proportions for them. Common w/c ratios. Workability. Slump test. Compression test. Curing.
Aggregate: Coarse and Fine aggregates, grading curve and fineness modulus.

class 14th

Class 15th to 19th

Notes UNIT 2 Part 3 Aggregate

Notes UNIT 2 Part 3 Aggregate

Follow and download file
Notes UNIT 2 Part 3 Aggregate



Notes UNIT 2 part 2 Concrete

Notes UNIT 2 part 2 Concrete

Follow and download file
Notes UNIT 2 part 2 Concrete



B.C. Punmia book shall be referred

Sunday, 1 September 2013

Notes UNIT-2 Part 1 Mortar

Follow the link and download
Notes UNIT-2 Part 1 Mortar


Thursday, 29 August 2013

Notes UNIT 1 Part 4 Iron & Steel

Notes UNIT 1 Part 4 Iron & Steel

Follow the link and download
Notes UNIT-1 Part-4 IRON AND STEEL

Wednesday, 28 August 2013

27th Aug class 13 BCE- Concrete

27th Aug class 13 BCE- Concrete
Topic-
workability, slump test, compression test, seggregation, bleeding

27th Aug class 13 BCE Slide

Monday, 26 August 2013

26th Aug 2013 BCE- Class 12th Slides

Class 12th
Basic Civil Engineering
Topic- Concrete-ingredients,curing, M10, M15, M20 Nominal mix and uses

Follow link and download slides
Class 12th Lecture Slides

Sunday, 25 August 2013

Notes on Rocks- Basic Civil Engineering

Basic Civil Engineering-Notes
Rocks:

follow the link and download
Notes on Rocks: Unit 1, No-3

Thursday, 22 August 2013

22 Aug 2013 BCE Class 10th Slide 9

Basic Civil Engineering
Topics covered - Cast Iron, Wrought Iron, Mild Steel, Tor Steel

Follow the link to download Slide:
 Class 10th Slide 9

QSE LAB- Experiment No-5 Analysis of rates

QSE LAB- Experiment No-5 Analysis of rates

Follow link and download file:
1) QSE LAB- Experiment No-5 Analysis of rates
2) Excel sheet.

Tuesday, 20 August 2013

19th Aug 2013- BCE - Rocks- Important stones and uses

BCE
Rocks- Important stones and uses
Quarrying and Dressing of stones
Stones properties

Follow the link to view and download slides
Class 9 - Slide 8 Link 

Sunday, 18 August 2013

BCE 1st Test Marks- 13th Aug 2013

Marks of First test dated 13th August 2013

Follow the link to see marks , If correction is required , contact me.


Analysis of first test.

Super Bonds (100) can become university toppers if worked hard
6
Bonds (91-99) can become Toppers if worked hard
17
Losers 81-90 Can become Bonds if worked hard
12
Super Losers 51-80 Needs improvement
11
Super Duper Losers 40-50 Study Hard
10
Does not exist 0-40 4


Friday, 16 August 2013

16th august 2013 BCE Class 6 ,7 , 8 Slides

CEMENT -OPC,PPC, WHITE CEMENT, PSC & GRADES OF CEMENT
ROCKS- Classification

download slides from links below

Class 6th link GRADES OF CEMENT
class 7th link CEMENT -OPC,PPC, WHITE CEMENT, PSC 
Class 8th Link ROCKS- Classification

Monday, 12 August 2013

12 Aug 2013 Basic Civil Engineering - Setting Time / Vicat apparatus test

Basic Civil Engineering

Topics covered:-
Initial and final setting 
times, use of Vicat needle apparatus

Follow the link below and download slide no -4 , Class 5 ( 12th Aug 2013)
Sky drive link

Sunday, 11 August 2013

QSE LAB lecture 4 & 5


LECTURE 4TH AND 5TH

ANALYSIS OF RATES
CONCRETE WORKS,BRICK WORK,FLOORING AND PLASTERING

SLIDE (LECTURE 4 AND 5)
EXCEL SHEET
ATTENDANCE TILL 8TH AUGUST 2013

Thursday, 8 August 2013

Basic Civil Engineering Slide -3 Cement - raw materials and manufacturing

Basic Civil Engineering Slide -3

Topics Covered
Cement - raw materials and manufacturing

go to below link and download slide
Slide 3- Download Link- Skydrive

Wednesday, 7 August 2013

building materials Notes on Bricks

Covered :

BUILDING MATERIAL
Bricks: Nominal and actual dimensions of modular and traditional bricks. Frog. Good brick earth,
moulding, characteristics of good bricks, compression test and absorption test, classification of
bricks.


Find link and download file from there
link- (skydrive)

Basic Civil Engineering- Slide 2- Bricks Part 2

Topics Covered

Compression test, Water Absorption test,  Classification of bricks


Please find attached link and download files from there.
Link - (Sky drive)

Tuesday, 6 August 2013

Basic Civil Engineering Slide 1- Bricks


 UNIT – I
BUILDING MATERIAL

Topics Covered
Bricks: Nominal and actual dimensions of modular and traditional bricks. Frog. Good brick earth,
moulding,

Lecture 1& 2  link (Skydrive)

Sunday, 4 August 2013

Wednesday, 31 July 2013

EXPERIMENT NO 2 CBRI METHOD

Find attached file link.

See format for writing experiments on copy .
From now onwards , write only on this format.

CBRI Experiment 2
Submit this in First week of August, 2013

Students should not copy mistakes.

Tuesday, 30 July 2013

Quantity Surveying and Estimation Lecture 3 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
7. Analysis of rates: Concrete work, Brick work, Plaster, Flooring
+
USE OF MS OFFICE EXCEL

7th A1 29th July 2013   
W -2,8,16,18,25,26,27,28,30,32.33.34.36.37.38.39.41.42.45.47.51.52.53.54.56.58.59.61
L -6,7,10,11,12,13,17,20,21,22,23,24,29,31.40.46.49.50.
Rest were absent .
No of Copies Submitted - 27/61

Correction : 
Water charge will be 1 % of  ( total material and labour cost ) and not of  (material + labour + contingents )
Profit will be 10 % of  ( total material and labour cost ) and not of  (material + labour + contingents ) as taught in class.

7th B1/B2-
W -2,4,6,7,10,12.13.16.18.19.20.23.25.26.30.32.36.37.38.39.41.42.43.46.47.48.49.50.51.54
L  -1.8.9.11.14.15.17.21.24.27.28.29.31.33.34.35.44.45
Rest were absent .
No of Copies Submitted - 14/54

Link 1 - Microsoft Drive
Link 2 Class 3 slides and excel sheets (Google Drive)

Tuesday, 23 July 2013

Quantity Surveying and Estimation Lecture 2 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
2. Estimated cost of a proposed building from materials and labour by CBRI method
3. Calculation of wall area in a building by measuring floor area for ordinary building and framed
structure.
4. Calculation of approximate cost of water supply, sanitation, electrical works for a building. 
+

USE OF MS OFFICE EXCEL


Date -
7th A1 - 22 july 2013
Absent - 05, 09, 15,26
7th A2 - 23 July 2013
Absent- 35, 44, 57
 
7th B1 - 25 July 2013
Absent-1,3,5,11,12,13,14,15,16,17,19,22,24,26
7th B2 - 26 July 2013
Absent-31,33,36,39,41,43,45,48,53


Lecture 2 link (Drive)
CBRI Excel Sheet (mediafire)
Class 2 PPT (mediafire) 

SOLVE Question Given in the lecture 2 slide.
SUBMIT LECTURE 1 and LECTURE 2 ALL QUESTIONS  Solved in Practical Copy or A4 sheet (Attached in file) by  
7th A1 - 30th July 2013
7th A2 - 31st July 2013
7th B1 - 2 Aug 2013
7th B2 - 3 Aug 2013  
TRY Solving question of CBRI Method using Excel or else can do calculation manually.
Please Note that reports submitted after the desired date shall not be considered for checking / Remarks .


Monday, 22 July 2013

Quantity Surveying and Estimation Lecture 1 Slides

Quantity Surveying and Estimation Lecture 1 Slides

Topics Covered
Experiment no-
1. Estimating cost of a proposed building on Plinth area method, Volume area method.

Date -
7th A1 - 15 july 2013
Absent - 03, 05, 09,13,15,26
7th A2 -16 july 2013
Absent- 35, 48,50,52,56
7th B1 -18 july 2013
Absent- 03,05,12,13,16,19,29
7th B2 -19 july 2013
Absent-44

Lecture 1 link