neeraj kumar thakur 2013. Powered by Blogger.

Wednesday, 31 July 2013

EXPERIMENT NO 2 CBRI METHOD

Find attached file link.

See format for writing experiments on copy .
From now onwards , write only on this format.

CBRI Experiment 2
Submit this in First week of August, 2013

Students should not copy mistakes.

Tuesday, 30 July 2013

Quantity Surveying and Estimation Lecture 3 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
7. Analysis of rates: Concrete work, Brick work, Plaster, Flooring
+
USE OF MS OFFICE EXCEL

7th A1 29th July 2013   
W -2,8,16,18,25,26,27,28,30,32.33.34.36.37.38.39.41.42.45.47.51.52.53.54.56.58.59.61
L -6,7,10,11,12,13,17,20,21,22,23,24,29,31.40.46.49.50.
Rest were absent .
No of Copies Submitted - 27/61

Correction : 
Water charge will be 1 % of  ( total material and labour cost ) and not of  (material + labour + contingents )
Profit will be 10 % of  ( total material and labour cost ) and not of  (material + labour + contingents ) as taught in class.

7th B1/B2-
W -2,4,6,7,10,12.13.16.18.19.20.23.25.26.30.32.36.37.38.39.41.42.43.46.47.48.49.50.51.54
L  -1.8.9.11.14.15.17.21.24.27.28.29.31.33.34.35.44.45
Rest were absent .
No of Copies Submitted - 14/54

Link 1 - Microsoft Drive
Link 2 Class 3 slides and excel sheets (Google Drive)

Tuesday, 23 July 2013

Quantity Surveying and Estimation Lecture 2 Slides

Quantity Surveying and Estimation Lecture 2 Slides

Topics Covered :-
Experiment Nos -
2. Estimated cost of a proposed building from materials and labour by CBRI method
3. Calculation of wall area in a building by measuring floor area for ordinary building and framed
structure.
4. Calculation of approximate cost of water supply, sanitation, electrical works for a building. 
+

USE OF MS OFFICE EXCEL


Date -
7th A1 - 22 july 2013
Absent - 05, 09, 15,26
7th A2 - 23 July 2013
Absent- 35, 44, 57
 
7th B1 - 25 July 2013
Absent-1,3,5,11,12,13,14,15,16,17,19,22,24,26
7th B2 - 26 July 2013
Absent-31,33,36,39,41,43,45,48,53


Lecture 2 link (Drive)
CBRI Excel Sheet (mediafire)
Class 2 PPT (mediafire) 

SOLVE Question Given in the lecture 2 slide.
SUBMIT LECTURE 1 and LECTURE 2 ALL QUESTIONS  Solved in Practical Copy or A4 sheet (Attached in file) by  
7th A1 - 30th July 2013
7th A2 - 31st July 2013
7th B1 - 2 Aug 2013
7th B2 - 3 Aug 2013  
TRY Solving question of CBRI Method using Excel or else can do calculation manually.
Please Note that reports submitted after the desired date shall not be considered for checking / Remarks .


Monday, 22 July 2013

Quantity Surveying and Estimation Lecture 1 Slides

Quantity Surveying and Estimation Lecture 1 Slides

Topics Covered
Experiment no-
1. Estimating cost of a proposed building on Plinth area method, Volume area method.

Date -
7th A1 - 15 july 2013
Absent - 03, 05, 09,13,15,26
7th A2 -16 july 2013
Absent- 35, 48,50,52,56
7th B1 -18 july 2013
Absent- 03,05,12,13,16,19,29
7th B2 -19 july 2013
Absent-44

Lecture 1 link